The Tier 5 project was a data storage
centre of the highest specification and security requirements. To fit within
the existing redundant metal press workshop of the previous Mitsubishi car
factory, the development was innovative and advanced thinking. The project was
designed in stages and to utilise the enormous existing gantry crane so that
computer storage pods could be added and removed by being lifted in and out of
position as required.